At the house I have finished painting the bedroom, the hall, the kitchen, the dining room, the living room and stairs. I still have to paint the inside of the kitchen cabinets and the window over the sink. I have to restore and repaint the kitchen door. The counter tops still need replacing. The bedroom, dining room, kitchen and staircase all need to have the hardwood floors cleaned, stained, and sealed. The dining room needs to have the one window replaced along with part of the wall. The living room still needs a tad of work on the mantle and surrounding wood wall.
Upstairs I need to strip out what was a bedroom but will be the game room, the flooring needs to be ripped up, the walls scrubbed, sanded, spackled and painted. The spare room upstairs needs...everything. The vestibule down stairs has yet to be done, the front storm door and main door need replacing. The basement needs sealing, insulating and having drylock applied...
That's just a few of the main things, there are areas which need touch up, areas that need lights wired and there is a 220 outlet and circuit breaker I need to remove and replace for 110. Then there is the garage that needs to be insulated and wired. Not to mention there are lights that need replacing, shelves to removed, shelves which need to be modified, and a bathroom that needs to be destroyed, removed and replaced. The entire job is not progressing as fast as it should. You see....I have physical issues, knees, legs etc, but the real reason is the one word..
You see, all day long I think of the things that will need doing that night and everyday very little gets done..You see I suffer from that damn one word...
Lazy
No comments:
Post a Comment